FAQ

Q:

Can you provide customized transformers tailored to our project's specific parameters?

A:
Absolutely. High-level customization is our core competency. Our engineering team will create a bespoke design based on your project's specific voltage levels, capacity, impedance, phase configuration, and operating environment. For instance, regarding rectifier transformers, we can provide complex industrial system solutions ranging from 6-pulse to 60-pulse configurations.
Q:

Which international standards do your transformer products comply with?

A:
Our products are strictly designed and manufactured in accordance with major international standards, including those set by the International Electrotechnical Commission (IEC), the Institute of Electrical and Electronics Engineers/American National Standards Institute (IEEE/ANSI), and Chinese National Standards (GB). Furthermore, our factory has obtained various international certifications—such as the ISO 9001 Quality Management System certification—to ensure the safety and stability of our product quality.

We can also arrange for third-party certifications—such as CE, UL, and CSA—to meet your specific requirements for project bidding and customs clearance.
Q:

Which industries primarily utilize your specialized transformers?

A:
Our equipment is specifically designed for heavy industries operating under high-load conditions and in harsh environments. It is widely applied in sectors such as steel metallurgy, non-ferrous metal smelting (e.g., aluminum and copper), chemical electrolysis, green hydrogen production (water electrolysis), as well as in new energy facilities and AI data centers that demand exceptionally high power quality.
Q:

What is the standard lead time for producing a customized transformer?

A:
The lead time depends on the transformer's type, capacity, and the complexity of the customization. Typically, the lead time for standard distribution or power transformers is 8 weeks; however, the production cycle for highly customized, large-scale specialized transformers (such as large-capacity ferroalloy furnace transformers or rectifier transformers)—as well as products requiring special certifications—takes approximately 12 to 16 weeks.
Q:

How do you ensure the safety of heavy-duty transformers during long-distance international shipping?

A:
We possess extensive experience in international logistics. The main transformer unit and its accessories are packed using high-strength, seaworthy packaging, and are equipped with comprehensive measures for moisture protection, rust prevention, and three-dimensional shock absorption (such as the installation of 3D shock recorders). We collaborate with professional international logistics partners to ensure the safe delivery of equipment to your project site, utilizing either breakbulk or Ro-Ro vessels.
Q:

Do you provide on-site installation guidance and after-sales services overseas?

A:
Yes, we do. We maintain a highly experienced global service team. In addition to providing 24/7 remote technical support, we can dispatch professional engineers to your overseas project site to offer installation guidance, on-site testing, and live commissioning services.
Q:

What is your warranty policy for transformers?

A:
We typically offer a standard warranty period of 12 months from the date of successful on-site commissioning, or 18 months from the date of shipment (whichever occurs first). Depending on the specific project contract, we can also provide extended warranty services.
Leave a message
First Name *
Last Name *
Email *
Message *